免费看人妻换人妻互换A片爽_亚洲中文字幕Av_亚洲国产第一页_日韩精品影院在线链接_国产蜜桃一区二区精品_久久久久久久精品免费_国产在线观看无码免费视频 _无码人妻精品一区二_成人亚洲AV无码专区一区丁香

Welcome to Ningbo Chaori Hydraulic.Co.Ltd.!
CN EN ES
Hotline

(86)13208083169

0574-88850227

Accumulator installation precautions

皮囊式蓄能器2.jpg

 

The accumulator should be installed at a convenient location for inspection and maintenance. When used to absorb shock and pulsation, the accumulator should be close to the vibration source, and should be installed in the place where the impact is easy. The installation position should be away from the heat source to prevent the system pressure from rising due to the thermal expansion of the gas.


The accumulator must be securely fastened but not allowed to be welded to the main unit and should be securely supported on the bracket or on the wall. When the diameter ratio is too large, hoop reinforcement should also be provided.


In principle, the capsule accumulator should be installed vertically downwards. When tilting or horizontally mounted, the bladder is in contact with the shell by buoyancy, which hinders normal telescopic operation, accelerates the damage of the bladder, and reduces the risk of accumulator function. . Therefore, the method of tilting or horizontal mounting is generally not used. There are no special installation requirements for diaphragm accumulators, and the oil ports can be installed vertically, tilted or horizontally downwards.


A check valve should be installed between the pump and the accumulator to prevent the oil in the accumulator from flowing back into the pump and returning to the tank when the pump stops working, causing an accident.


青浦区| 盐边县| 屏边| 塘沽区| 浪卡子县| 苍山县| 历史| 手游| 三门县| 黄平县| 兴仁县| 镇雄县| 榆林市| 丁青县| 黔西县| 淮阳县| 七台河市| 林甸县| 游戏| 芦山县| 东安县| 牡丹江市| 临海市| 大理市| 华安县| 屏边| 高要市| 牙克石市| 麻江县| 莎车县| 乌海市| 延津县| 桃园县| 伊金霍洛旗| 建宁县| 郯城县| 沁阳市| 雅安市| 龙川县| 嘉黎县| 麻江县|