免费看人妻换人妻互换A片爽_亚洲中文字幕Av_亚洲国产第一页_日韩精品影院在线链接_国产蜜桃一区二区精品_久久久久久久精品免费_国产在线观看无码免费视频 _无码人妻精品一区二_成人亚洲AV无码专区一区丁香

Welcome to Ningbo Chaori Hydraulic.Co.Ltd.!
CN EN ES
Hotline

(86)13208083169

0574-88850227

Accumulator nitrogen filling vehicle operation steps

未標(biāo)題-1.jpg

  

Operation steps of the accumulator nitrogen filling vehicle:

The first step: first open the control box three-wire power supply (380V);

Step 2: Open the unloading valve (position reference manual) on the hydraulic module of the pump station until the system oil pressure drops to 0 MPa (ie, the pressure gauge shows 0);

Step 3: Open the top cover of the accumulator, then unscrew the black cap inside, and rotate the handle of the nitrogen-filled special tool to the maximum position (counterclockwise to the maximum), connect the accumulator, and press the special tool handle. Rotate clockwise. When you hear the sound coming out of the gas, observe the pressure gauge on the tool. The pressure display value is the pressure of the accumulator. At this time, turn it counterclockwise to the maximum and remove the special tool.

When the pressure is less than 5 MPa, it is necessary to flush the accumulator. The above is the detection process.


泌阳县| 嘉黎县| 防城港市| 定结县| 梧州市| 岳阳市| 容城县| 西吉县| 望奎县| 长寿区| 杭锦后旗| 武宣县| 江口县| 德令哈市| 探索| 洪洞县| 铁岭市| 富裕县| 奇台县| 油尖旺区| 苗栗市| 江达县| 江源县| 高台县| 武陟县| 偏关县| 当阳市| 铜川市| 来安县| 新龙县| 西乌| 土默特右旗| 南京市| 西华县| 公安县| 绥阳县| 芒康县| 景洪市| 墨脱县| 柳江县| 灵山县|